International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
|
Volume 44 - Issue 19 |
Published: April 2012 |
Authors: Deepak Gupta, Sameer Sharma, Shefali Aggarwal |
![]() |
Deepak Gupta, Sameer Sharma, Shefali Aggarwal . A Mathematical Approach for Three Stage Flow Shop Production Schedule with Jobs in a String of Disjoint Job Block. International Journal of Computer Applications. 44, 19 (April 2012), 41-48. DOI=10.5120/6375-8836
@article{ 10.5120/6375-8836, author = { Deepak Gupta,Sameer Sharma,Shefali Aggarwal }, title = { A Mathematical Approach for Three Stage Flow Shop Production Schedule with Jobs in a String of Disjoint Job Block }, journal = { International Journal of Computer Applications }, year = { 2012 }, volume = { 44 }, number = { 19 }, pages = { 41-48 }, doi = { 10.5120/6375-8836 }, publisher = { Foundation of Computer Science (FCS), NY, USA } }
%0 Journal Article %D 2012 %A Deepak Gupta %A Sameer Sharma %A Shefali Aggarwal %T A Mathematical Approach for Three Stage Flow Shop Production Schedule with Jobs in a String of Disjoint Job Block%T %J International Journal of Computer Applications %V 44 %N 19 %P 41-48 %R 10.5120/6375-8836 %I Foundation of Computer Science (FCS), NY, USA
The aim of this paper is to introduce the concept of disjoint job blocks in n-jobs, three machines flow shop scheduling problem to minimize the total elapsed time and rental cost of the machines under a specified rental policy in which the processing time associated with probabilities including transportation time. A heuristic approach for flow shop with a computational algorithm to find optimal or near optimal solution is described. A computer program followed by a numerical illustration is given to justify the proposed algorithm.