|
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
|
| Volume 44 - Issue 19 |
| Published: April 2012 |
| Authors: Deepak Gupta, Sameer Sharma, Shefali Aggarwal |
10.5120/6375-8836
|
Deepak Gupta, Sameer Sharma, Shefali Aggarwal . A Mathematical Approach for Three Stage Flow Shop Production Schedule with Jobs in a String of Disjoint Job Block. International Journal of Computer Applications. 44, 19 (April 2012), 41-48. DOI=10.5120/6375-8836
@article{ 10.5120/6375-8836,
author = { Deepak Gupta,Sameer Sharma,Shefali Aggarwal },
title = { A Mathematical Approach for Three Stage Flow Shop Production Schedule with Jobs in a String of Disjoint Job Block },
journal = { International Journal of Computer Applications },
year = { 2012 },
volume = { 44 },
number = { 19 },
pages = { 41-48 },
doi = { 10.5120/6375-8836 },
publisher = { Foundation of Computer Science (FCS), NY, USA }
}
%0 Journal Article
%D 2012
%A Deepak Gupta
%A Sameer Sharma
%A Shefali Aggarwal
%T A Mathematical Approach for Three Stage Flow Shop Production Schedule with Jobs in a String of Disjoint Job Block%T
%J International Journal of Computer Applications
%V 44
%N 19
%P 41-48
%R 10.5120/6375-8836
%I Foundation of Computer Science (FCS), NY, USA
The aim of this paper is to introduce the concept of disjoint job blocks in n-jobs, three machines flow shop scheduling problem to minimize the total elapsed time and rental cost of the machines under a specified rental policy in which the processing time associated with probabilities including transportation time. A heuristic approach for flow shop with a computational algorithm to find optimal or near optimal solution is described. A computer program followed by a numerical illustration is given to justify the proposed algorithm.